The ServerLift SL500 is designed to meet strict computer center maintenance requirements by providing a data center solution to install computers and other equipment. Customers state that server room safety is a key priority when installing servers. ServerLift Corporation has emphasized ergonomics in the server lift design. The ServerLift SL500 is an advanced server and overall data center installation solution device. It offers peace of mind to users in any server room environment. Personnel can perform information center maintenance in a safe manner without sacrificing efficiency and effectiveness. ServerLift Corporation is confident that the SL500 will surpass your needs for this aspect of data center maintenance.
The ServerLift SL500:
- Reduces risk of disability cases, hospital bills, equipment damage, data loss and downtime.
- Improves manner in which computer equipment is migrated in and around server farms and data centers.
- Is an advanced, optimized server handling solution - ideal for information center maintenance operations.
- Offers peace of mind — facilitating up-time through efficient computer installation and lifting of other information center equipment
- Reduces risk of disability cases, hospital bills, equipment damage, data loss and downtime — improves manner in which computer equipment is migrated in and around server farms and data centers.
- Further improves data center safety compliance activities - ergonomically addresses server maintenance challenges appropriately by providing the ability to move and lift, heavy and bulky equipment.
- Is versatile - allowing servers and related equipment to be easily handled within server farms over raised floors, to different locations and between narrow aisles - compact for easy storage.
Outline Specifications
The SL500 Motorized Server Lift
- Electrically operated server handling lift — 12 volt electronics
- Compact and heavy duty structure - allows for optimal use in and around computer facilities and server farms.
- Rated to lift up to 500 pounds.
- Eight-foot lifting height
- Two vertical position controls allow for operation from both sides.
- Automatic, Varispeed hoist system provides for both accurate positioning and rapid vertical movement.
- Side-shifting platform reaches six inches into standard, 19 racks and cabinets.
Input from hundreds of companies resulted in the safest and most efficient server lifting solution. Research included product evaluations by such companies as IBM and AT&T -- obtaining their input in regard to computer installing, migrating and handling within a server farm environment. Representative customers include government agencies, defense contractors, Fortune 500 companies and educational institutions. One of our customers, Cornell University, has placed the SL500 on its ergonomic website, as an example of a safe approach for installing computers, servers and related equipment.
|
|
Customer A: Used an alternative lift to migrate servers
A national organization purchased a ServerLift SL500 after their data center experienced a serious server migration related accident resulting from the use of a different solution. The alternative lift did not have the necessary features and functions to address safe handle of servers. For example, the existing solution lacked the ability to provide a safe transition from the lift to the rack. A $10,000 server was dropped onto an installerís foot causing bone damage, server damages, and data loss.
Repercussions of this common incident included the need for server replacement and setup, the cost of workers compensation claim, down time, insurance suit, and so forth. Estimated cost of using alternative solution exceeded $100,000.
Customer B: Installing Servers Manually
Data center technicians were instructed to install servers by hand. Attempting to lift a 60LB server over their head, a technician experienced an extensive back injury necessitating his placement in the Intensive Care Unit at the local hospital. Although the server was not damaged in this case, the employee experienced a significant injury to his upper spine.
This accident caused the company to settle a hefty law suit, and was required to implement a safer method of migrating servers — ServerLift SL500 was selected as the improved solution.
Estimated cost of the incident in this case was in excess of $1 million. Repercussions to the technician include reoccurring and permanent spinal damages, personal and family distress, over one year of workers compensation, and several years of rehabilitation and occupational therapy.
Customer C: Employees Complaining of Pain
This is a common complaint related to personal injury. After years of lifting servers by hand the company decided to go ahead and purchase a ServerLift SL500 because employees brought to management their suggestion that handling servers was becoming a tremendous physical burden. In addition, delays and system downtime for repairing, replacing, and implementing servers were becoming evident.
Luckily, the firm identified the serious issues before experiencing a major repercussion. This data center now has satisfied its need to safely and effectively migrate servers and is pleased to carry on business knowing that systems are safe and easily movable.
Customer D: Internal Safety Audit
Based in California, this global company desperately needed a solution to safely migrate servers. Audits by the firms safety personnel recommended a safer server migration solution. A ServerLift SL500 was selected after receiving approvals to invest in more ergonomic solutions.
This corporation was pleased to see inspection ratings improve drastically. The results of safety audits and ordering of a ServerLift SL500 has resulted in an ergonomic solution. Being that the customer is a trendsetter within its industry with regards to safety and ergonomics, other clients have purchased the ServerLift SL500.
Customer E: Unrecoverable Data Loss
Prior to scheduled overnight backup procedures, this corporation wanted to simply move a vital operations server to another rack located only a few steps away. Using an alternative lift, the server was dropped during the transition to the rack. This jolt caused the hard drive to fail and become inoperable. The data in the server was unrecoverable. This loss of critical data required that specialists worked around the clock until corporate operations were able to function properly again.
In the past, this and similar situations were experienced by the company. The ServerLift SL500 has proven to be an invaluable tool in preventing serious data and system losses due to inappropriate migration activities.
Customer F: Migration to New Data Center
With the impending completion of a new data center, a savvy data center manager decided to invest in a ServerLift SL500. Realizing that literally hundreds of servers had to be installed in the new facility, she decided that saving time and implementing a cost effective solution would help her achieve the objectives of the installational requirements.
The server migration time was decreased by approximately 50%. Furthermore, the ServerLift SL500 has been able to remain an important part of the data centers infrastructure by continuing to safely and effectively migrate servers on a day-to-day basis.
|